How to use the bulldozer ripper shank
First Step: Preparation before operate the bulldozer
1. Bulldozer Inspection
- Verify hydraulic oil level(The oil temperature need ≥10℃, if in cold area need preheat to 40℃)
- Check the dozer ripper shank tooth tip wear (Single tooth wear ≤30% of original length)
- Test lift cylinder range(full movement time should ≤15 seconds)
2. Terrain assessment
- Mark underground utilities or obstacles
- Measure ground slope(adjust working direction if exceeding 15°)
Second Step: Basic Bulldozer Operation Procedure
1. Bulldozer Positioning
- Park the bulldozer 2-3 meters from the working face
- Adjust bulldozer ripper shank to 55°±5° optimal angle
2. Layered Ripping
- First time penetration depth: 1/3 of tooth length (For example 10-15cm for 30cm teeth)
- Use "stepwise advancement" in hard strata: lateral movement = 80% of tooth spacing
3. Bulldozer speed control
Soil Type | Recommended Speed | Penetration Depth | |
Hard Clay | 2-3 KM/H | 20-30 cm | |
Weathered Rock | 1.5 KM/H | 15-20 cm | |
Frozen Soil | 1 KM/H | 10-15 cm |
4. Bulldozer Reset Process
- Raise ripper 30cm above ground before reversing at face end
- Never drag under load (prevents tooth broken)
---
Third Step: Special Condition Handling
Use "cross-breaking method": create longitudinal grooves first, then break transverse protrusions
Fourth Step: Safety Prohibitions
1. Ripper shank without tooth install operation prohibited(The ripper shank need to installed with all the tooth needed)
2. Immediately stop if hydraulic pressure exceeds 22MPa or drops below 16MPa
3. More carefully for sudden hardness changes
4. No personnel within 5m behind ripper during operation
Fifth Step: Maintenance after the bulldozer finished the work
1. Remove tooth adhesives immediately (use copper hammer, avoid steel tools)
2. Lubricate all pins (inject lithium grease until old grease extrudes)
3. Lower ripper to ground and release hydraulic pressure when storing

